ZP-747 Engine Cooling System Avoids
The adoption enters to annoy the road system design first, the pressure is adjustable to annoy the liquid impact to clean with the high pressure, resolving the clearance cooling system thoroughly to embroider in the iron, the dirt of water and others sink to accumulate the thing.Dredge the cooling waterway, raise the water tank to spread the hot effect, make the engine cool off the temperature to recover normally.
Working pressure: 60PSI-80PSI
Outside Specification: 380MM330MM985MM
PROFESSIONAL Manufacturer Of Engine Cooling System Avoids Made In China